Educational Spaces for People to Thrive

Farmington High School

Farmington High School is a unique and innovative comprehensive high school as a result of a hands-on collaborative planning process involving Davis School District administrators, staff, faculty, students, and VCBO Architecture. Utilizing a series of interactive meetings with the stakeholders, key design ideas including different size classrooms, flexible learning spaces, and learning suites with teacher offices were developed. In conjunction with this input, VCBO Architecture conducted a detailed study of class sizes of four DSD high schools which provided integral data that acted as a driver in the change of the high school design model that the District had been using. The design of the new high school uses fact-based assumptions for class size, accommodates project- and problem-based learning, and continues the model of collaborative learning that Davis School District has been a leader in propagating for the past 20 years.

One very critical aspect of the concept is to treat teachers as professionals. Providing classroom spaces that are varied in size and completely flexible allows instructors to utilize the right space for the right learning experience for students. Additionally, every instructor has a private office to use during prep periods and before and after class time. This allows the school to significantly increase the utilization of learning spaces, key to meeting the district construction budget and student load requirements.

One very critical aspect of the concept is to treat teachers as professionals. Providing classroom spaces that are varied in size and completely flexible allows instructors to utilize the right space for the right learning experience for students. Additionally, every instructor has a private office to use during prep periods and before and after class time. This allows the school to significantly increase the utilization of learning spaces, key to meeting the district construction budget and student load requirements.

Services

Architecture,
Interiors

Project Size

405,000 SqFt

Client

Davis School District

Location

Farmington, UT

1  / 5

1  / 5

Top
Top